11.6.2024 – Local area energy plans support carbon neutral urban planning. The superblock of the future is built on these principles.

Themes
Energy
Share

A carbon neutral local area energy plan is the result of working together towards mutual goals. Utilizing waste energy flows and the opportunities provided by low-temperature heat networks and demand response are key factors in energy and cost efficient urban planning of the future. 

The on-going NSDC initiative, together with previous projects, has generated many valuable insights. Here are five of them. 

1. Solutions emerge through dialogue 

A local area energy plan is based on extensive collaboration. It is crucial to engage in dialogue between property developers, energy companies, cities, and planners, to ensure that all solutions benefit the entire energy plan, and not just individual parties. At the core of the development work is systems thinking, where everything affects everything. 

Cities want to invest in urban planning in order to achieve their carbon neutrality goals. Affecting the energy consumption of buildings through solutions made by energy companies is one method. The problem is that decarbonising the entire energy system while the green transition is still on going, and fossil fuels are still used in energy production, is difficult. 

Property specific, or joint plans for multiple properties that are based on local and renewable energy, are another solution. Both are needed to achieve the goals. 

2. Contract process requires time and commitment 

We have been involved in developing several energy plans, where we have engaged in market dialogue, drafted energy partnership agreements, and bid energy suppliers. We have discovered that the contracting process is complex and requires plenty of time. 

Suppliers should be contacted early in the project to ensure all parties have enough flexibility to implement the necessary solutions. For the project to be successful it is important that all parties commit to the project throughout its development, implementation, and maintenance phases. 

We offer experience-based expertise when considering, what kind of an implementation is viable. The contracts can last up to twenty years, and must benefit all parties. 

3. The use of district heating must be timed wisely 

A local area energy plan should primarily utilize the internal waste energy flows of the area. These are generated, for example, from the cooling systems and commercial refrigeration equipment. Energy is also produced using boreholes and heat pumps. 

Energy storage can cover momentary peaks and increase the renewable energy coverage but it is not cost-effective to size the base production to cover energy consumption fully. 

The remaining energy shortfall is typically covered by an electric boiler or district heating. If aiming for carbon neutrality, the use of district heating must be timed wisely when utilizing this type of a district heating hybrid solution. 

During peak consumption fossil production methods, such as oil and gas, are also used in district heating production. Therefore, district heating should be utilized outside of peak times when energy consumption is low, and only renewable energy production methods are being used. 

4. A Low-temperature heat network enables the utilization of waste heat 

In a local area energy plan, a low-temperature heat network is used to distribute heat to the buildings in the area. Heat is produced to the network from waste heat sources including  ground-source boreholes, air-to-water heat pumps, and electric boilers. The higher the temperature of the water produced by the heat pump, the worse the efficiency. When the temperature is kept low, the efficiency of the heat pump is better, and the heat network’s thermal losses are smaller. 

The traditional district heating water temperature is usually between 80–115 degrees Celsius, but in a low-temperature heat network it is only 40–50 degrees. This low temperature allows the utilization of waste heat generated from, for example, commercial cooling and refrigeration equipment and its distribution through the area’s heat distribution network. 

5. Demand response reduces costs 

Demand response means adjusting the indoor conditions of a building when energy consumption is at its peak. Savings are achieved by allowing the indoor temperature to momentarily drop to 18 degrees Celsius during extreme cold, or by reducing consumption in other ways when electricity prices are at their highest. 

A so-called rebound effect refers to a higher consumption after the response period, allowing the return to a normal indoor temperature. Savings are achieved by shifting the consumption from expensive periods to cheaper ones. In a local area energy plan demand response is automated using system connections and algorithms. 

Want to discuss more?

Oskari Fagerström

Group Manager
Granlund Oy

Local area energy plan is at the core of urban planning 

  • A local area energy plan refers to the entirety formed by the buildings, different energy production methods, energy networks, energy storage in the area, and their interactions. The goal is to promote carbon neutrality and reduce energy costs. 
  • The area’s energy supply is based on local renewable energy sources. The system utilizes internal waste energy flows. Energy consumption adjusts to consumption peaks. 

Read more blogs

Five Key Insights into the Future Superblock – Achieving Carbon Neutral Urban Planning 

11.06.2024 – Local area energy plans support carbon neutral urban planning. The superblock of the future is built on these principles.

Blog post

Finland and Sweden are the best locations for data centres

06.06.2024 – Of all the countries in the world, the best locations for a data centre are Finland and Sweden. We offer…

Blog post

Development of sustainable solutions expands from real estate to city blocks

06.02.2024 – At the moment, all development activities are focused around mitigating climate change. We must find new ways of reducing emissions.

Blog post
Granlund Sweden people talking at the office

Three things to consider when choosing a data center designer

20.11.2023 – Responding to the ever-growing need for sustainable data processing means new data center sites are popping up and existing ones…

Blog post

Why wouldn’t you share data?

25.10.2023 – The lack of a data sharing culture prevents the construction and real estate industry from utilising data to its full…

Blog post

How we calculate our carbon handprint

10.10.2023 – When we help our customers reduce their carbon footprint, we increase our carbon handprint. We calculate our carbon handprint using…

Blog post

What’s data got to do with it?

28.09.2023 – Imagine a building project where a building information model could simulate and analyse different scenarios based on energy, costs, schedules,…

Blog post

Should we calculate carbon handprint alongside carbon footprint?

30.03.2023 – Carbon handprint aims at capturing the positive climate impacts that a company produces to its’ clients or to the society…

Blog post

EU taxonomy for sustainable activities should not be ignored

31.01.2023 – The EU classification system for sustainable funding, also known as EU taxonomy, impacts construction projects. The planning stages of a…

Blog post

Recycling waste heat from data centres to district heating networks should be increased

11.01.2023 – Energy-efficiently built data centres are part of the power reserve of the electricity grid. By using renewable energy sources for…

Blog post

Subscribe to our newsletter

Be among the first to hear about the latest news and trends relating to Granlund and the real estate and construction sectors

Search