Skip to content
Building services engineering for the Hospital District of Helsinki Area

Building services engineering for the Hospital District of Helsinki Area

2.7.2021 – We have offered expert services in technical building services, hospital design and energy consumption to a number of Hospital District of Helsinki Area's facilities, including the Bridge and Tower Hospitals.

Industries
Hospitals and healthcare
Services
HVAC design, Electrical design, Building automation design, Fire safety engineering, Medical equipment design, Granlund Manager
Locations
Finland, Granlund Group

Technical building services for the new Bridge Hospital

The Bridge Hospital in Meilahti is the largest construction project with cost estimation of EUR 280 million ordered by HUS-Kiinteistöt Oy that is the Joint Authority for the Hospital District of Helsinki Area. The hospital is scheduled for completion in 2023. Granlund and Ramboll are jointly responsible for HVAC, telecom, building automation and electrical design, fire prevention and the design of fixed medical equipment.

Important design elements at the Bridge Hospital are a simple and functional structure and flexibility. The environment is safe and easy to approach for the patients and promotes a good experience, while the integrated digital systems facilitate the work of healthcare professionals.

Meilahti Tower Hospital

In 2014, we provided HVAC, sprinkler, building automation, medical equipment and electrical design and energy efficiency consulting for the Meilahti Tower Hospital. The Tower Hospital was also a pilot project in energy-efficient renovation, and we managed to reduce energy consumption considerably while improving the indoor conditions.

Granlund Manager’s condition and energy simulation was used in the project. Ways of improving energy efficiency included the recycling and recovery of energy streams, geothermal heating and cooling systems and modern building automation.

Energy savings through technical building services audits

We also audited technical building services and building automation for Hospital District of Helsinki Area. The aim of the audits was to map out the energy saving potential of the properties and to ensure the functionality of the technical building services and indoor conditions. The audits were based on the building automation systems, field visits and interviews with use and maintenance staff. The corrective actions generated energy savings of approximately EUR 500,000.

The Granlund-Ramboll group must have both technical expertise and cooperation skills. We want the good collaborative spirit to pervade the entire project.

Mikael Lindgren, Ramboll

Want to hear more?

Jukka Vasara

Vice President
Granlund Oy

Hospital District of Helsinki Area

Finland, Granlund Group

Wärtsilä Smart Technology Hub is a pioneer in eco-efficiency

Service

MEP Design, Environmental certifications

Industry

Industry

Wärtsilä Smart Technology Hub develops environmentally friendly technology in environmentally friendly facilities. Granlund’s designers help Wärtsilä reach the ambitious eco-efficiency…
Reference
Finland, Granlund Group

Electrical engineering and digital solutions for the New Children’s Hospital

Service

Electrical design, Tele and security design, Fire safety engineering, Audiovisual and presentation technology design, Medical equipment design

Industry

Hospitals and healthcare

Granlund was responsible for the electrical engineering at the New Children’s Hospital.
Reference

Ask for more information or request a quote

Tell us about your project or what kind of service you need. We will get in touch with you shortly.

Subscribe to our newsletter

Be first to hear about the latest news from Granlund and building sector.

Search